

The City Beach Lifeguard Tower Canopy is now taking its shape down in our workshop.
The entire Canopy is being built with Comptech FRP Profiles suitable for the marine environment and high UV conditions experienced by the harsh WA sun.
This doesn’t include just the structural members, but connections will also be made by chemical fixing (bonding) or mechanically fixing withFRP bolts, or a mixture of both.
Leave a Comment